The basis of this project was to develop of upgrade long tail water pump. Given
that, seventeen weeks to do project planning, design the model of long tail pump, and
demonstrate the project.
In the planning stage, project leader should ensure the project scheduled must be
efficient and effective enough. It need consider the time, material, manpower,
resources, site and else. The designing stage are the most important part because
need to do a detail design for the upgrade long tail water pump, include the small
compartment. After that, start to construct the pump by using variety of tools to this
project such as welding, grinding, cutting, painting etc. Lastly when finish, do a test
and trial to determine whether it function as necessary or not.
pump is one of the most important system on board of the ship. Pump use to
transfer liquid from low place to high place. With our innovation it will help many people
who need use pump such as farmer. This pump was upgrade from the original version
since it can be improved with our idea. We study design that has been provided to us
in marine workshop. In the end, our project successfully builds and working perfectly. |