Please use this identifier to cite or link to this item:
http://hdl.handle.net/123456789/7072
Title: | Synchronize Aircraft Hydraulic Jacking System For Cessna 310 |
Authors: | Muhammad Arif Bin Azis |
Issue Date: | 6-Jun-2014 |
Abstract: | This research is devoted to the improvement on current aircraft jack that is to create a principle to make the jacking of the aircraft become much easier. The purpose of the project is to create a synchronize aircraft jacking system or also can be describe as creating all the jacks that are being used for jacking an aircraft operate in sync by only one personnel operating it. In this project the aircraft that will be focused on is the Cessna 310 aircraft. The procedure of jacking the Cessna 310 aircraft will be obtain by referring to the aircraft maintenance manual (AMM) of the aircraft itself. By the end of this research, this final year project will be able to simulate the product and the project will be able to achieve all the objectives that is listed in the first chapter of this thesis. The objective of the project is to create a system that will make the jacking of aircraft to be operated by only using one personnel and the movement of all the jacks that will be used will move in synchronize movement |
Description: | Bachelor Of Aircraft Engineering Technology (Hons) Mechanical, July 2013 |
URI: | http://localhost/xmlui/handle/123456789/7072 |
Appears in Collections: | Final Year Project - UniKL MIAT |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Muhammad Arif Bin Azis.pdf | 3.14 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.