Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/5243
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdul Latif Bin Yacob-
dc.date.accessioned2013-12-11T08:55:41Z-
dc.date.available2013-12-11T08:55:41Z-
dc.date.issued2013-12-11-
dc.identifier.urihttp://ir.unikl.edu.my/jspui/handle/123456789/5243-
dc.descriptionBachelor of Engineering Technology (HONS) In Manufacturing Systemen_US
dc.description.abstractPoor layout design is determine as a major problem contribution in small and medium industry. These particular problems thus affect the productivity and the line efficiency as well. Throughout the study, the aim is to proposed new layout to the related company to increase their productivity. The major step is to identify a bottleneck workstation in current layout. After identify related problems, the current layout is redesign by computing the standard time and processing time in each workstations. In each workstation the processing time is different and the longest time consumption is workstation will be identified as a bottleneck workstation. This related line is studied by time study techniques. The time is taken by stopwatch. In this study, application of Enterprise Dynamics tools is introduced which in this study is Enterprise Dynamics Simulation. The related inputs are going to be simulated with this software. The manual calculation also included especially in line balancing algorithm. The goal of the thesis is to seek the best layout in terms of line efficiency and productivity rate hence proposed to the company. Throughout the study, 3 layouts have been achieved. Among 3 layouts only one will be propose to the company. This layout has better line efficiency and rate of productivity.en_US
dc.titleAn Implementation of Lean Strategy on Production Flow Line at OMI Sdn.Bhden_US
Appears in Collections:Final Year Project - UniKL MIDI



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.