Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/2185
Title: Development Of DB Circuit Breaker
Authors: Aliff Shahzuan bin Sulaiman
Issue Date: 22-May-2013
Abstract: This project automatic control of power distribution project is develop an automatic control of power distribution box use GSM system controlled by mobile phone via SMS. The functions required can be activated from distance away just by typing a simple SMS. This could be proved a huge advantage; consumer can cut on or off this circuit breaker automatically. Example, simple massage display “System started” when ON or display “tripping detected” when OFF. Consumer can be more confident, feel safe and comfortable. The system is also installed with Global System for Mobile Communication (GSM) that will send a warning message to owners if detected a “trip detected” enabling the consumer to take further action.
Description: Top 20
URI: http://ir.unikl.edu.my/jspui/handle/123456789/2185
Appears in Collections:Final Year Project - UniKL BMI

Files in This Item:
File Description SizeFormat 
ALIFF SHAHZUAN BIN SULAIMAN (51210110062).pdfTop 201.89 MBAdobe PDFView/Open    Request a copy
Copyright Declaration - Aliff Shahzuan.PDF57.62 kBAdobe PDFView/Open    Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.