dc.description.abstractThe construction industry has many underlying causes of uncertainty that impact on late delivery of project completion's performance as well as in time management. Most of researchers proposed a modelling and simulation techniques to solve these uncertainties problem nevertheless not tackling the uncertainty in environmental issues (EI). Yet, the environmental issues were also leading significant deviations for project completion performance, which means it is important to be studied.Therefore, the comprehensive sturvey is discussed in this paper in purpose to develop the uncertainty modeling model on late delivery in environmental issues. The development of conceptual model through a comprehensive survey involving piping's construction industry for water supply company with multi-project construction environment is developed to show the relationship for each cause and affects that underlying uncertainty on late project delivery in environmental issues. Further research is to verify and validate the conceptual model as has been analyzed through fractional factorial design with ANOVA, through the development of uncertainty model via modeling and simulation using MATLAB.en_US
dc.language.isoenen_US
dc.subjectUncertaintyen_US
dc.subjectConceptual Modelen_US
dc.subjectLate Deliveryen_US
dc.subjectEnvironmental Issuesen_US
dc.subjectConstructionen_US
dc.titleDevelopment of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issuesen_US
dc.conference.nameThe 5th International Conference On Mechanical and Aerospace Engineeringen_US
dc.conference.year2014en_US
Appears in Collections:Conference Paper

Files in This Item:
File Description SizeFormat 
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues.pdfDevelopment of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues452.09 kBAdobe PDFView/Open    Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.