Please use this identifier to cite or link to this item:
http://hdl.handle.net/123456789/6849
Title: | Project ID : An Application Of Carrier E 20 HAP |
Authors: | Juliana Abd Ghani, Muhd Anuar Muhd Helmi Nik Mohd Alif Nik Yahaya |
Issue Date: | 15-May-2014 |
Abstract: | This final year project report details is about to get a total cooling load for UniKLMFI new building that located in, Bangi. This building generally is for education for UniKLMFI students.There is much multipurpose room to calculate the load with different criteria of each room. Design criteria include all the equipment, materials using in the building band according to the design condition state in ASHRAE STD. After analyze the information, the load for overall building estimation was done using by E-20 Carrier Hourly Analysis Program 4.40 Software with taking into account about lighting, electrical equipment, occupancy, infiltration and walls, windows, and doors. The suitable air conditioning system for this building must install to give a comfort condition to students and all lecturers for each room and also can reduce monthly or yearly electricity cost. |
URI: | http://localhost/xmlui/handle/123456789/6849 |
Appears in Collections: | Final Year Project - UniKL MFI |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PROJECT ID AN APPLICATION OF CARRIER E 20 HAP.pdf | 1.24 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.